Huawei Quidway Switch 5300 Series

The S5352C-EI is a case-shaped device with a 1 U high chassis, provided in a
- limited version LI - provides various Layer-2 functions
- standard version SI - supports Layer-2 functions and basic Layer-3 functions
- enhanced version EI - supports all routing protocols and features
- advanced version HI - supports all routing protocols and features and MPLS, hardware OAM.

LS-S5352C-EI Overview

• Power: need to purchase additional power LS5M100PWA00 or LS5M100PWD00
• Non-POE Switch
• Layer 3 Ethernet Switch
• Ports: 48 GE
• Extended Interface Card Slot: 1
• Software: Enhanced Version
• Stackable switch
• Powerful Service Support
• High Reliability
• Security and QoS
Quidway S5300 series gigabit switches are new generation Ethernet gigabit switches that meet the requirements for high-bandwidth access and Ethernet multi-service convergence, providing powerful Ethernet functions for operators and enterprise customers. Based on the new generation high-performance hardware and Huawei Versatile Routing Platform (VRP), the S5300 features large capacity and gigabit interfaces of high density, provides 10G uplinks, meeting the requirements for the 1G and 10G uplink devices of high density. The S5300 can meet the requirements of multiple scenarios such as service convergence on campus networks and Intranets, the access to the IDC at a rate of 1000 Mbit/s, and the access to computers at a rate of 1000 Mbit/s on Intranets.

Monday, May 5, 2014

Extending Grace Period on Win2008 R2

Most of the content I use for webcasts and live events have virtual machines that have been created either by someone on my team or by someone at Microsoft corporate.  The virtual machines are not created with trial versions of the operating system but with fully licensed product.  For obvious reasons they are not activated, so when I first boot up I usually get a message saying the machine has to be activated within a few days.  Sometimes though, the machines have past the activation grace period and will not log on unless they are activated NOW!!  This can be somewhat annoying because most of the time I only need the machines for a demonstration the following week, maybe for the next month or so, and I don’t want to use one of my product keys for such a short term machine life.  So what can I do?  
The first thing I do with machines that are requiring immediate activation is simply turn them off.  I then change my host machine date back to a date closer to when the virtual machines were originally created and boot them up one more time.  Now the virtual machine thinks my date is kosher and is within the activation grace period, and lets me logon.  That’s great but the date is wrong and I need to access the internet with the host as well as do my demos, and having a wrong date causes issues.  Never fear, one of the things we can do with Windows Server 2008 and Windows Server 2008 R2 (actually this works with Windows Vista and Windows 7 as well), is re-arm the machine and extend the activation grace period another 60 days.

So How’s This Done?

Simple… all we need to do is run a script in the windows\system32 folder called slmgr.vbs.  Check the steps below:
  1. Bring up a Command Prompt.
  2. Type slmgr.vbs –rearm, and press ENTER.
  3. Restart the computer.
You computer has now extended the evaluation period 60 days!!!  You can re-arm up to 3 times giving you an activation-free trial period of a total of 240 days!!

How Much Time Is Remaining in the Evaluation Period

You can find out by running the same script this time with different switch:
  1. Type slmgr.vbs -dli, and the current status of the evaluation period is displayed.  (the dli switch means – display license information)
If you want to find out what else you can do with the script type slmgr.vbs –? and you’ll get a full list and explanation of all the switches.